Post RFQ
The core advantage of this equipment lies in its integrated test module, eliminating the need for multiple split devices, greatly shortening test preparation and completion time, with a single test process controllable within 30 minutes. The industrial-grade touch screen supports one-click test procedures, and the built-in AI algorithm can automatically identify abnormal test data to avoid human operation errors. The IP54-rated sheet metal shell is suitable for outdoor temporary operation scenarios, and it supports remote data transmission to synchronize test results to the background management system and connect with the enterprise ERP system. In addition, the equipment is equipped with overcurrent and overvoltage protection mechanisms to ensure the safety of the test process and operators, and test parameter preset schemes can be quickly switched for transformers of different capacities.

Detailed specifications include: maximum output DC voltage: 0~20kV; turns ratio test range: 1~10000; insulation resistance test range: 0~100TΩ; no-load loss test accuracy: ±0.5%; equipment operating noise ≤65dB; standard test cable length: 5m; support for custom test report templates; built-in 1TB local data storage; power input requires stable 380V three-phase 50Hz mains power; the overall transportation size can be split into a main cabinet and test accessory box for long-distance transfer.
It is mainly applicable to regular inspection of transformers by power maintenance companies, ex-factory quality inspection of transformer manufacturers, preventive tests of substations and arrival acceptance of transformers in power engineering construction. Typical usage scenarios include annual preventive detection of oil-immersed transformers in county-level substations, batch finished product testing of small transformer manufacturers, rapid performance evaluation of damaged transformers on-site for outdoor emergency repairs, and it can also adapt to the detection of new energy supporting step-up transformers, meeting the comprehensive testing needs of transformers in different scenarios.