Post RFQ
The core advantage is the mobile design, equipped with an off-road towable chassis, which can be quickly transported to the engineering site by truck, and can be put into production without fixed installation; it adopts a lightweight body design, reducing the weight by 20% compared with the same type of fixed equipment, which is convenient for transportation and deployment; it adopts radial extrusion forming process, which can quickly produce qualified cement pipes without steam curing, and the production efficiency reaches 10-18 pieces per hour; it is equipped with an adjustable power supply system, supporting two power supply modes of 380V/50Hz and 220V/60Hz, adapting to the power grid standards of different regions; the mold adopts quick-release design, and the replacement time is only 20 minutes, adapting to the production of pipes of different calibers.

The pipe diameter range is 150mm to 800mm, the standard length of a single pipe is 1-1.5m can be customized, the main drive motor power is 22KW, the power supply can be selected as 380V/50Hz or 220V/60Hz, the overall dimensions are 5200mm in length, 2600mm in width and 3200mm in height, the whole machine weight is 4.2 tons, the noise control is within 76dB, the production efficiency is stable at 10-18 pieces per hour, the mold replacement cycle is ≤20 minutes, it adapts to two cement pipe mold types of flat and socket, the concrete slump is adapted to 50-80mm, and it is equipped with a portable control box, allowing operators to remotely control the equipment within 3 meters.
It is mainly used in temporary water conveyance pipes of outdoor water conservancy projects, post-disaster reconstruction infrastructure pipe production, remote rural drinking water project pipe prefabrication, temporary drainage pipes at engineering sites, suitable for outdoor engineering teams, mobile building material service teams, and remote infrastructure construction projects, can be put into production quickly without fixed factory buildings, greatly reducing the transportation cost and delivery cycle of pipes, and solving the problem of pipe supply in remote engineering sites.